Client: PDVSA | Location: Bachaquero, Zulia state | Year: 2024
Contingency plan for the control of the emergency caused by oil spill in the tank yard and drainage channel of Bachaquero.
Bachaquero, Zulia state – year 2006.
Long-range excavation, long-range amphibious excavator, containment barrier, C / MFB boat, 25m3 Hopper trucks, dump trucks, Vacuum trucks, skimmer equipment, crude pumps and earthmoving equipment.