Client: PETROBOSCAN | Location: Campo Boscán, Zulia state | Year: 2024
Sanitation, restoration and final disposal of substances, materials and hazardous waste in the areas affected by oil spill in the Catatumbo River basin (Zone VII).
Campo Boscan, Zulia state – year 2009.
Long-range excavator, earth moving equipment and 25 m3 hopper trucks