Client: PEQUIVEN | Location: Puertos de Altagracia, Zulia state | Year: 2024
Extraction, transfer and final disposal of the sludge contained in the drying beds of the RAS plant of the Ana María Campos Complex.
Ports of Altagracia, Zulia state - year 2015.
Long reach excavator, earthmoving equipment and 25 m3 hopper trucks.