Client: CORPOZULIA | Location: Catatumbo River, Zulia State | Year: 2024
Construction of permeable breakwaters in the Catatumbo River, to control the erosion of the river's right margin in the Guasimales, Tasajeras and Pampanito sectors.
Catatumbo River , Zulia State – year 2000
Long-range excavators, barge crane with driving equipment, metal structure manufacturing equipment, tugboat and earthmoving equipment.