Client: Ministry of People's Power for Eco socialism and Water. | Location: Mene Mauros, Falcon State | Year: 2024
Dredging and partial rehabilitation of the tower takes from the Matícora reservoir Phase III.
Mene Mauroa, Falcon State – Year 2014
Cutting and suction dredger, long reach excavator, long reach amphibious excavator and 50 Ton telescopic crane.